Integrate gitlab-ci/CLEAOS-747-increase-timeout-in-test-job
requested to merge integrate/gitlab-ci/CLEAOS-747-increase-timeout-in-test-job/into/seco_5.10.110 into seco_5.10.110
Commit: clea-os/infrastructure/gitlab-ci@b9f9b4fd
[TEST] Increase timeout in order to allow jobs to terminate
Over time, the number of tests performed for each board increased, which in turn resulted in some jobs failing to finish tests within the 4h timeout. In future, split test jobs will be planned according to the type of tests (probe, functional or stress) performed.